AES Services · Field Asset Studies

Field Asset Studies

Turn Installed-System Information Into a Defined Next Step

AES provides field asset study capabilities for analytical and sampling systems. These services help facilities understand installed conditions, document concerns, and develop a more practical basis for maintenance, retrofit, installation, or replacement decisions.

01

Survey

Walkdowns

02

Assess

Sample and analyzer systems

03

Prioritize

Reliability studies

04

Plan

Scope, BOM and budget

What It Is

What Is a Field Asset Study?

A field asset study reviews installed equipment and its operating context to support a defined decision.

Depending on the assignment, it may:

✓ Document system configuration
✓ Assess sample handling or analyzer interfaces
✓ Examine maintenance concerns
✓ Develop quantities and assumptions

Capabilities

Field Asset Study Capabilities

Six studies, from a focused walkdown to a scoped budget.

Engineer walking a pipe rack with a clipboard during a site walkdown
01

Site Surveys & Walkdowns

Document installed equipment, routing, access, connection points, and visible differences from available drawings. Use the findings to establish a more reliable starting point for the next work stage.

Learn more about Site Surveys & Walkdowns →

Engineer tracing a sample line from a process probe to a conditioning panel
02

Sample System Assessments

Review the sample path from the extraction interface through transport and conditioning to the analyzer or collection point. Identify concerns that warrant further investigation or a defined modification scope.

Learn more about Sample System Assessments →

Engineer reviewing an analyzer cabinet and its utilities in a shelter
03

Analyzer System Assessments

Examine how the analyzer, sample system, utilities, environment, and maintenance arrangement work together. Separate instrument-specific concerns from broader package and installation issues.

Learn more about Analyzer System Assessments →

Maintenance records and work-order history on a laptop in a control room
04

Reliability & Maintainability Studies

Review recurring problems, service history, access constraints, and component support needs to help prioritize practical improvements.

Learn more about Reliability & Maintainability Studies →

Engineers marking work boundaries on a plot plan drawing
05

Installation Scope Development

Translate field findings and project requirements into defined work boundaries, connection details, dependencies, and planning assumptions.

Learn more about Installation Scope Development →

Bill of materials, calculator and component catalogs beside an analyzer drawing
06

BOM & Budget Development

Develop a bill of materials and a scoped budget basis using the available design and field information. Make quantities, exclusions, allowances, and unresolved items visible.

Learn more about BOM & Budget Development →

Plant manager and engineer discussing options at a whiteboard in a site office

Decision First

Start With the Decision You Need to Make

Tell AES whether the study is intended to plan maintenance, evaluate a retrofit, prepare an outage, or establish a capital-project budget. The deliverable should fit that decision. A rapid visual survey and a detailed assessment with operating data require different levels of effort and produce different levels of certainty.

Tell AES whether the study is intended to:

✓ Plan maintenance
✓ Evaluate a retrofit
✓ Prepare an outage
✓ Establish a capital-project budget
Discuss a Field Asset Study →

Why AES

Why Choose AES for Field Asset Studies?

AES connects field observations with integration, fabrication, and installation considerations. That practical perspective helps frame recommendations around the work required to implement them, including access, tie-ins, component availability, and the next information needed.

Contact AES →

AES connects

01 Field observations
02 Integration
03 Fabrication
04 Installation

FAQ

Frequently Asked Questions

Engineer inspecting an installed sample system and taking notes Ask us anything →

Do we need complete drawings before requesting a study?

No. Incomplete documentation can be one reason to begin with a walkdown. Available records should still be provided so the study can identify what is confirmed, missing, or inconsistent with field conditions.

Can a study establish the cost of a retrofit?

It can support budget development when the scope and available information are sufficient. The estimate should state its assumptions and maturity rather than imply a fixed construction price before design and quantities are resolved.

Is an asset study a formal compliance audit?

Not unless expressly contracted with the required scope and qualifications. A field study does not automatically certify regulatory compliance, functional safety, structural adequacy, or equipment fitness for service.

Define Your Field Asset Study

Share the equipment involved, the decision you need to support, and the information already available. AES can help shape a study with a clear purpose and deliverable.

Discuss a Field Asset Study →
Scroll to Top