Field Services · Commissioning

Startup & Commissioning

Move From Installed Equipment to Documented Operating Readiness

AES supports startup and commissioning activities for analytical and sampling systems within an agreed project scope. We help connect installation completion with the checks, coordination, and records needed for the next stage of operation.

01

Readiness

Completion review

02

Verify

Sample and utilities

03

Functions

Coordinated checks

04

Handover

Punch lists and records

What It Is

What Is Analyzer Commissioning?

AES supports the startup and commissioning of analyzers and associated systems.

Commissioning can include:

✓ Analyzer setup with factory trained technicians
✓ Utility checks
✓ Flow path verification
✓ Control-function checks
✓ Calibration

Capabilities

Startup and Commissioning Capabilities

Four steps from installation completion to a documented handover.

Engineer reviewing an installation completion checklist in an analyzer shelter
01

Readiness and Completion Review

Review installation status, open items, available utilities, required documentation, and the readiness of associated equipment. Identify conditions that must be addressed before functional testing or process introduction.

Technician verifying flow on a rotameter on a sample panel
02

Sample and Utility Verification

Agreed activities can check that sample paths and utilities are arranged as intended. These checks should use approved criteria and account for the analyzer's specified inlet and operating requirements.

Factory-trained technician and plant engineer checking analyzer functions
03

Functional Check Coordination

The commissioning plan identifies which switching, calibration, alarm, and control functions require verification. Manufacturer participation and specialist configuration work are coordinated when required by the equipment or warranty conditions.

Handover binder with commissioning records and a punch list
04

Punch Lists and Handover Records

Record exceptions and assign responsibility for resolution. The final handover package can include agreed check records, outstanding items, equipment documentation, and maintenance information within the contracted scope.

Acceptance First

Define Acceptance Before Testing Begins

A useful commissioning scope states what will be tested, who will provide test media, which results are acceptable, and who can authorize the next stage. Measurement accuracy, response time, and process performance require application-specific criteria rather than generic promises.

If the package has already completed factory acceptance testing, use those records to inform field checks while recognizing that site connections and operating conditions introduce additional interfaces.

Discuss Startup & Commissioning →

A useful commissioning scope states:

✓ What will be tested
✓ Who will provide test media
✓ Which results are acceptable
✓ Who can authorize the next stage

Why AES

Why Choose AES for Commissioning Support?

AES links startup planning and technician support with the integration, fabrication, and field installation work that precedes it. This system-level perspective helps ensure success when the job is handed off in the field.

01

Startup planning

02

Technician support

03

Integration

04

Fabrication

05

Field installation

FAQ

Frequently Asked Questions

Technicians verifying an installed analyzer with a test gas cylinder Ask us anything →

Is commissioning the same as factory acceptance testing?

No. Factory testing checks agreed functions before shipment, often under simulated conditions. Site commissioning addresses the installed system, its facility connections, and the agreed readiness or operating requirements.

Does AES replace the analyzer manufacturer's startup service?

Some equipment requires manufacturer-authorized setup or service. AES helps define those responsibilities and coordinates the appropriate resources.

What must be ready before commissioning starts?

Typical prerequisites include completed installation work, approved procedures, available utilities, required test media, and access to the relevant personnel. The final checklist depends on the equipment and site.

Plan Your Analytical System Startup

Share the equipment scope, construction status, and target startup date with AES to discuss readiness checks and commissioning responsibilities.

Discuss Startup & Commissioning →