AES Services · Grab Sampling

Grab Sampling Capabilities

Practical Support for the Entire Sampling Station Lifecycle

AES provides grab sampling system services for industrial facilities that need representative samples and a practical way to manage the equipment used to collect them. Our capabilities span station design and installation, upgrades, and structured Plant Sampler Reliability Program (PSRP).

01

Design

Station arrangement

02

Install

Tie-ins and handoff

03

Maintain

Plant Sampler Reliability Program

04

Upgrade

Retrofits to existing stations

What It Is

What Is Grab Sampling?

Grab sampling collects a process sample at a specific time for laboratory analysis or another defined test.

The appropriate system depends on:

✓ Sample media
✓ Process conditions
✓ Sample container
✓ Analytical method
✓ Exposure controls

Capabilities

Grab Sampling Capabilities

Five services that follow a sampling station from first design to long-term care.

Closed-loop grab sampling panel with sample cylinder and return line
01

Closed-Loop Grab Sampling

Closed-loop grab sampling provides a controlled sample path for suitable applications. System selection considers operating conditions, process pressure and temperature, sample properties, container requirements, and the intended return point.

Learn more about Closed-Loop Grab Sampling →

Technician installing a new grab sampling station beside process piping
02

Sample Station Installations

AES supports the installation of new grab sampling stations and associated equipment. The field scope connects the selected station to the process while addressing access, tie-ins, utilities, and installation requirements.

Learn more about Sample Station Installations →

Technician inspecting a grab sampling station during a scheduled visit
03

Annual Sampling System Reliability Programs

AES's Plant Sampler Reliability Program combines an initial survey, part inventory, quarterly inspections and repairs, standardized reporting, and operator training.

Learn more about Annual Sampling System Reliability Programs →

Isometric drawings beside a partially assembled sample station
04

Sample Station Design & Fabrication

Develop the sampling arrangement around the application, then define the equipment and fabrication requirements. AES's published design scope includes tie-point identification, technology recommendations, datasheets, isometric drawings, and redline piping and instrumentation diagrams.

Learn more about Sample Station Design & Fabrication →

Existing grab sampling station being upgraded with new valves and tubing
05

Sample Station Upgrades & Retrofits

Update existing stations to address changed requirements, component condition, maintenance difficulties, or limitations in the installed arrangement. The retained equipment and process interfaces should be reviewed before modifications are selected.

Learn more about Sample Station Upgrades & Retrofits →

Who It Serves

Support for Operations, Maintenance, and Project Teams

01

Operations

Operations needs a workable sampling task.

02

Maintenance

Maintenance needs accessible components and clear service information.

03

Project teams

Project teams need defined equipment, installation requirements, and documentation.

The published AES service base includes refining, petrochemical, and oil and gas facilities. Application suitability and the required scope are reviewed for each new project.

Why AES

Why Choose AES for Grab Sampling?

AES's specialized grab-sampling expertise connects design and installation with the ongoing care of installed assets. A project can therefore begin with a new sampling requirement or an existing asset that needs better performance.

Contact AES →

AES connects

01 Design
02 Installation
03 Ongoing care of installed assets

FAQ

Frequently Asked Questions

Grab sample bottle and sample cylinder carried from a sampling station Ask us anything →

Can AES support an existing sampling station?

Yes. Share the manufacturer, configuration, process conditions, and known issues. The equipment can be reviewed for a repair, retrofit, or reliability-program scope based on its condition and requirements.

Can installation and operator training be coordinated?

Yes, when both are included in the scope. Training should address the installed arrangement and the facility's approved procedures, with responsibilities and audience defined in advance.

How do we choose between a new station and a retrofit?

Start with the required sampling task and the condition of the existing equipment. A review can identify whether a targeted change is suitable or a new arrangement is needed.

Discuss Your Grab Sampling Application

Tell AES what you need to sample, how the sample is analyzed, and what is happening at the current station. We can help define the next step.

Discuss a Grab Sampling Project →
Scroll to Top